> To overview: sample connections sorted by digital command stations
> To overview: sample connections sorted by digital components
> To product description: DiCoStation
> To product selection: DiCoStation MM
description | file | edition |
---|---|---|
DiCoStation (AC voltage supply) with DigitalBooster DB-4 | page_937 | 06/2022 |
DiCoStation (DC voltage supply) with DigitalBooster DB-4 | page_1561 | 06/2020 |
Connecting the second DigitalBooster DB-4 | page_1634 | 07/2020 |
Digital-current ring conductor with multiple supply connection | page_1635 | 07/2020 |
Seperate digital-current conductor for the decoder | page_1636 | 07/2020 |
DiCoStation: Feedback via s88-standard cable or patch-cable to s88-N | page_1658 | 07/2020 |
Reed contacts for feedback (Standard) / patch-cable to s88-N | page_1637 | 07/2020 |
Reed contacts for feedback (Opto) / patch-cable to s88-N | page_1638 | 07/2020 |
Track occupancy feedback via contact tracks (Standard) / patch-cable to s88-N | page_1639 | 07/2020 |
Track occupancy feedback via contact tracks (Opto) / patch-cable to s88-N | page_1640 | 07/2020 |
Supply to monitored track sections (track occupancy feedback) / patch-cable to s88-N | page_1641 | 05/2020 |
Track monitoring via isolated center conductor / patch-cable to s88-N | page_1642 | 05/2020 |
Track section monitoring with total isolated track / patch-cable to s88-N | page_1643 | 05/2020 |
Track monitoring with two booster current circuits (with DB-4) / patch-cable to s88-N | page_1644 | 05/2020 |
Numbering the feedback registrations (RM-GB-8-N) / s88 standard cable | page_1629 | 05/2020 |
Numbering the feedback registrations (RM-GB-8-N) / patch-cable to s88-N | page_1630 | 05/2020 |
Numbering the feedback registrations (various feedback modules) / patch-cable to s88-N | page_1631 | 05/2020 |
Numbering the feedback modules (Opto) / s88 standard cable | page_1632 | 07/2020 |
Numbering the feedback modules (Opto) / patch-cable to s88-N | page_1633 | 06/2020 |
description | file | edition |
DiCoStation with DigitalBooster DB-2 | page_365 | 06/2020 |
Correct connection of the Booster DB-2 with the DiCoStation | page_503 | 07/2020 |
Connecting the second DigitalBooster DB-2 | page_425 | 07/2020 |
Digital-current ring conductor with multiple supply connection | page_404 | 07/2020 |
External supply to the Decoder | page_332 | 07/2020 |
Correct connection of the external AC supply voltage | page_509 | 07/2020 |
Seperate digital-current conductor for the decoder | page_405 | 07/2020 |
Ring conductor to the decoder | page_016 | 01/2020 |
Suppression of interferences caused by end-off switched turnouts | page_333 | 07/2020 |
DiCoStation: Feedback via s88-standard cable or patch-cable to s88-N | page_1658 | 07/2020 |
Reed contacts for feedback (Standard) / patch-cable to s88-N | page_1570 | 07/2020 |
Reed contacts for feedback (Standard) / s88 standard cable | page_693 | 07/2020 |
Reed contacts for feedback (Opto) / patch-cable to s88-N | page_1571 | 07/2020 |
Reed contacts for feedback (Opto) / s88 standard cable | page_714 | 07/2020 |
Track occupancy feedback via contact tracks (Standard) / patch-cable to s88-N | page_1572 | 07/2020 |
Track occupancy feedback via contact tracks (Standard) / s88 standard cable | page_694 | 07/2020 |
Track occupancy feedback via contact tracks (Opto) / patch-cable to s88-N | page_1185 | 07/2020 |
Track occupancy feedback via contact tracks (Opto) / s88 standard cable | page_715 | 07/2020 |
Supply to monitored track sections (track occupancy feedback) / patch-cable to s88-N | page_1184 | 05/2020 |
Supply to monitored track sections (track occupancy feedback) / s88 standard cable | page_561 | 05/2020 |
Track monitoring via isolated center conductor / patch-cable to s88-N | page_1573 | 05/2020 |
Track monitoring via isolated center conductor / s88 standard cable | page_631 | 05/2020 |
Track section monitoring with total isolated track / patch-cable to s88-N | page_1574 | 05/2020 |
Track section monitoring with total isolated track / s88 standard cable | page_632 | 05/2020 |
Track monitoring with two booster current circuits (with DB-2) / patch-cable to s88-N | page_1575 | 05/2020 |
Track monitoring with two booster current circuits (with DB-2) / s88 standard cable | page_633 | 05/2020 |
Track section monitoring and switching off (voltage free) | page_1344 | 03/2022 |
Numbering the feedback registrations (RM-GB-8-N) / s88 standard cable | page_910 | 05/2020 |
Numbering the feedback registrations (RM-GB-8-N) / patch-cable to s88-N | page_916 | 05/2020 |
Numbering the feedback registrations (various feedback modules) / patch-cable to s88-N | page_589 | 05/2020 |
Numbering the feedback modules (Opto) / s88 standard cable | page_776 | 07/2020 |
Numbering the feedback modules (Opto) / patch-cable to s88-N | page_782 | 06/2020 |
WatchDog decoder WD-DEC with DiCoStation and DigitalBooster DB-2 | page_493 | 03/2020 |
GBS-DEC-DC/MM: external switchboard panel PC-controlled and DiCoStation / patch-cable to s88-N | page_1517 | 03/2020 |
GBS-DEC-DC/MM: s88-feedback bus branching via Data switch DSW-88-N with DiCoStation | page_1219 | 03/2020 |
GBS-DEC-s88: external switchboard panel PC-controlled with DiCoStation and RM-88-N | page_1525 | 03/2020 |
GBS-DEC-s88: external switchboard panel PC-controlled with DiCoStation and RM-GB-8-N | page_1511 | 03/2020 |
description | file | edition |
DiCoStation with Märklin Booster 6015 | page_428 | 07/2020 |
description | file | edition |
DiCoStation with Märklin Booster 6017 | page_427 | 07/2020 |
description | file | edition |
DiCoStation with Uhlenbrock Booster Power 2 | page_861 | 07/2020 |
description | file | edition |
DiCoStation with Uhlenbrock Booster Power 3 | page_451 | 07/2020 |
Subject to technical changes and errors.
© 2022 by LDT
Märklin and Motorola are registered trade marks.