Sample-Connections: Feedback modules with integrated occupancy detectors RM-GB-8

The RM-GB-8 is not anymore available.

Please select the successor module RM-GB-8-N.

> To overview: sample connections from not anymore available components and versions
> To overview: sample connections for all available components
> To product description: RM-GB-8

description file edition
Intellibox (2-rail conductor):
Track occupancy feedback with one isolated rail page_017 01/2006
Track occupancy feedback with two isolated rails page_018 01/2006
Numbering the feedback registrations page_028 11/2004
Track monitoring with two booster current circuits (with DB-2) page_255 10/2020
Track monitoring with two booster current circuits (with Power 3) page_145 10/2005
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_345 01/2007
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
Intellibox (3-rail conductor):
Track monitoring via isolated center conductor page_022 03/2007
Track section monitoring with total isolated track page_023 03/2007
Numbering the feedback registrations page_028 11/2004
Track monitoring with two booster current circuit (with DB-2) page_254 10/2020
Track monitoring with two booster current circuit (with Power 3) page_143 10/2005
TWIN-CENTER (2-rail conductor):
Track monitoring with one isolated rail page_020 11/2004
Track monitoring with two isolated rails page_021 11/2004
Numbering the feedback registrations page_027 11/2004
Track monitoring with two booster current circuit (with DB-2) page_252 10/2020
Track monitoring with two booster current circuit (with TWIN-BOOSTER) page_146 10/2005
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_356 01/2007
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
Control Unit (6021) Märklin-Digital (3-rail conductor):
Track monitoring with isolated center conductor page_024 11/2004
Track monitoring with total isolated track page_025 11/2004
Numbering the feedback registrations at the Interface page_091 11/2004
Track monitoring with two booster current circuit (with DB-2) page_253 10/2020
Track monitoring with two booster current circuit (with Booster 6015) page_144 10/2005
EasyControl (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_303 10/2020
Track monitoring via isolated center conductor page_305 10/2020
Track section monitoring with total isolated track page_307 10/2020
Track monitoring with two booster current circuits (with DB-2) page_309 10/2020
Numbering the feedback registrations page_310 07/2006
EasyControl (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_302 10/2020
Track occupancy feedback with one isolated rail page_304 10/2020
Track occupancy feedback with two isolated rails page_306 10/2020
Track monitoring with two booster current circuits (with DB-2) page_308 10/2020
Numbering the feedback registrations page_310 07/2006
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
Accelerated feedback via HSI-88 page_319 10/2020
Accelerated feedback via HSI-88-USB page_471 10/2020
GBS-DEC-s88: external switchboard panel PC-controlled with EasyControl and RM-GB-8 page_484 10/2020
ECoS 2 (50200) (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_1063 09/2010
Track monitoring via isolated center conductor page_1064 09/2010
Track section monitoring with total isolated track page_1065 09/2010
Track monitoring with two booster current circuits (with DB-2) page_1066 10/2020
Numbering the feedback registrations page_1061 09/2010
ECoS 2 (50200) (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_1055 09/2010
Track occupancy feedback with one isolated rail page_1056 09/2010
Shuttle train line with one isolated rail page_1068 09/2010
Track occupancy feedback with two isolated rails page_1057 09/2010
Shuttle train line with two isolated rails page_1069 09/2010
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_1058 09/2010
Track monitoring with two booster current circuits (with DB-2) page_1059 10/2020
Numbering the feedback registrations page_1061 09/2010
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
ECoS 1 (50000) (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_379 01/2008
Track monitoring via isolated center conductor page_380 08/2007
Track section monitoring with total isolated track page_381 08/2007
Track monitoring with two booster current circuits (with DB-2) page_382 10/2020
Numbering the feedback registrations page_375 03/2007
ECoS 1 (50000) (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_366 08/2007
Track occupancy feedback with one isolated rail page_367 08/2007
Shuttle train line with one isolated rail page_449 10/2007
Track occupancy feedback with two isolated rails page_368 08/2007
Shuttle train line with two isolated rails page_452 11/2007
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_369 08/2007
Track monitoring with two booster current circuits (with DB-2) page_370 10/2020
Numbering the feedback registrations page_375 03/2007
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
DiCoStation (3-rail conductor):
Supply to monitored track sections (track occupancy feedback) page_417 10/2020
Track monitoring via isolated center conductor page_418 10/2020
Track section monitoring with total isolated track page_419 10/2020
Track monitoring with two booster current circuits (with DB-2) page_420 10/2020
Numbering the feedback registrations page_413 10/2020
DiCoStation (2-rail conductor):
Supply of monitored track sections (track occupancy feedback) page_406 10/2020
Track occupancy feedback with one isolated rail page_407 10/2020
Track occupancy feedback with two isolated rails page_408 10/2020
Occupancy detection at a reversing loop (with KSM1 from MÜT) page_409 10/2020
Track monitoring with two booster current circuits (with DB-2) page_410 10/2020
Numbering the feedback registrations page_413 10/2020
Track section monitoring and switching off (voltage free) page_019 10/2020
Monitoring of slow-down and stop-sections and common switching off
(voltage free)
page_458 10/2020
Equivalent current at monitored and non-monitored areas page_496 03/2008
Combine existing RM-GB-8 with RM-GB-8-N (1) page_1120 04/2020
Combine existing RM-GB-8 with RM-GB-8-N (2) page_1121 04/2020


Subject to technical changes and errors.
© 2020 by LDT
Märklin and Motorola are registered trade marks.